After lots of stops and starts, all that is left to do is some exterior paint and to fit the main doors. Work has already started on the electrical installation and water for fire sprinklers. Since the walls got so wet, they warped and parts of the siding had to be replaced. For some reason Tuffshed did other jobs on days where the weather was nice, and turned up to work on this one whenever it rained. We had what was probably the last rain of the winter on Sunday and Monday, but the roof was already tiled by then. The last video was the trusses being installed, here is the rest of the sequence.
Moving the viewpoint to catch trench digging around the back of the garage.