This morning I took the requested clarifications on the building design into the county offices. We should hear back in a week or two, it's minor stuff so I hope this is the last step. We already have our permit for the leach field repair, so I'm starting on that work. We got the septic tank pumped and inspected (it was in good condition) this week, and filed the inspection results with the county, so the next step is to put in a new re-routed pipe and diversion valve between the tank and the leach field.