Today about half the panels were put in place on the roof, and a lot of wiring was put in place.
Here are the installers starting to put panels in place in the morning.
In the evening the lowest row of 20 are in place, and about half of the next row. There will be a total of 60 panels when it's done.
Here is the underside of a panel, in a shipping rack on the truck.
A closeup of the panel's specification label, as I mentioned before, its a Cadmium Telluride CdTe thin film technology panel from First Solar. Each panel is rated at 75W, and the total installation is rated at 4.5KW.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.